Информация об источнике
Получено: 20.04.2026, 21:37:56
Тип источника: snapshot
Извлечённые данные
[PROPOSAL] Withdrawing remaining fees from PGN back to the Gitcoin Foundation Q2 2026 (Original Q4 2025)
Proposal to clawback idle funds sitting on PGN network as of April 16, 2026. Proposal first outlined August 2025. EOL of the network announced June 2024
Варианты голосования
Анализ
Резюме
Proposal to withdraw idle fee funds from PGN (Public Goods Network) back to the Gitcoin Foundation. PGN network reached end-of-life in June 2024, and funds remain idle as of April 2026.
Ключевые изменения
Withdraw remaining fees from PGN network
Transfer recovered funds to Gitcoin Foundation
Clawback idle funds as of April 16, 2026
⚠️ Риски
No specified destination address for recovered funds in the proposal text
No verification or execution details provided for the withdrawal process
Funds transferred to Foundation (centralized entity) rather than DAO treasury directly
⚠️ Преимущества
Recovers idle funds from a decommissioned network (EOL announced June 2024)
Prevents permanent loss of funds on deprecated PGN infrastructure
❓ Неизвестные факторы
Exact amount of fees to be withdrawn
Specific destination address for the recovered funds
Execution method and timeline for the withdrawal
Whether any claims process exists for users or contracts still on PGN
Цитаты из предложения
Proposal to clawback idle funds sitting on PGN network as of April 16, 2026
EOL of the network announced June 2024
Рекомендация
Обоснование
The proposal intent is sound (recovering stranded funds from an EOL network), but critical treasury parameters are missing: no amount specified, no destination address, and no execution details. For a user with high treasury_risk_sensitivity and needs_strict_spec=true, this underspecification presents material concern. The referenced EOL announcement and delayed timeline (originally Q4 2025, now Q2 2026) suggest legitimate operational necessity, but the lack of transparency on execution warrants caution.
⚠️ Конфликты с принципами пользователя
needs_strict_spec: Treasury proposal lacks specific amount and destination address
treasury_risk_sensitivity: No execution verification details provided
⚠️ Ограничения и предупреждения
This is not legal or financial advice.
The tool may have failed to extract all proposal parameters.
Critical parameters must be checked manually.
Верификация
Верифицировано: No
Валидаторы: Verified by 3 validators
Модель: zai-org/GLM-5-FP8
Корень Меркла: 3310653517794b45e34ff9c4abda7ad189498f603c2a4c77c09662a3205d1f59
ID запроса: 05fd48145a634b8a87a5d764ba00c229
Аукцион
Статус: Done
Ставок размещено: 1
Ставок раскрыто: 1
Адрес аукциона: https://explorer.ambient.xyz/address/2VAmBZdZRYURyWKPDAakPNPCadYNkKLBVY14T71GKnUN
Участник: https://explorer.ambient.xyz/address/98WKDq5HzneuZycJiCSM5ajuKzscQMop2GsRdxK95q2m
Граница верификации
Детерминистическое (проверяемое)
analysis.summaryanalysis.key_changes[0]analysis.key_changes[2]
Интерпретативное (требует проверки)
analysis.key_changes[1](interpretive) "Transfer recovered funds to Gitcoin Foundation..."analysis.risks[0](interpretive) "No specified destination address for recovered funds in the proposal text..."analysis.risks[1](interpretive) "No verification or execution details provided for the withdrawal process..."analysis.risks[2](interpretive) "Funds transferred to Foundation (centralized entity) rather than DAO treasury directly..."analysis.benefits[0](interpretive) "Recovers idle funds from a decommissioned network (EOL announced June 2024)..."analysis.benefits[1](interpretive) "Prevents permanent loss of funds on deprecated PGN infrastructure..."analysis.unknowns[0](uncertainty) "Exact amount of fees to be withdrawn..."analysis.unknowns[1](uncertainty) "Specific destination address for the recovered funds..."analysis.unknowns[2](uncertainty) "Execution method and timeline for the withdrawal..."analysis.unknowns[3](uncertainty) "Whether any claims process exists for users or contracts still on PGN..."recommendation.reasoning(interpretive) "The proposal intent is sound (recovering stranded funds from an EOL network), but critical treasury ..."recommendation.conflicts_with_user_principles[0](interpretive) "needs_strict_spec: Treasury proposal lacks specific amount and destination address..."recommendation.conflicts_with_user_principles[1](interpretive) "treasury_risk_sensitivity: No execution verification details provided..."
Флаги неопределённости
unknowns:Exact amount of fees to be withdrawnunknowns:Specific destination address for the recovered f...unknowns:Execution method and timeline for the withdrawalunknowns:Whether any claims process exists for users or c...
Метод
Kind: heuristic
Version: 2
- Deterministic layer is based on direct matching to extracted fields and evidence_quotes, plus presence of hard literals (numbers, addresses, option strings).
- Interpretive layer includes summary, risks, benefits, and recommendation reasoning.
- This is a boundary labeling aid, not a proof of truth.
Неделя 9 - Verification Hooks
Обнаружены смешанные категории: true
Требуется разделение: true
Строгий режим: false
Сработало строгое отклонение: false
Действие маршрутизации: WARN
Сегменты
analysis.summaryunverifiableProposal to withdraw idle fee funds from PGN (Public Goods Network) back to the Gitcoin Foundation.
Причины:not_anchored_to_source_materialanalysis.summarydeterministicPGN network reached end-of-life in June 2024, and funds remain idle as of April 2026.
Причины:contains_hard_literalanalysis.key_changes[0]unverifiableWithdraw remaining fees from PGN network
Причины:not_anchored_to_source_materialanalysis.key_changes[1]unverifiableTransfer recovered funds to Gitcoin Foundation
Причины:not_anchored_to_source_materialanalysis.key_changes[2]deterministicClawback idle funds as of April 16, 2026
Причины:contains_hard_literalanalysis.risks[0]probabilisticNo specified destination address for recovered funds in the proposal text
Причины:interpretive_fieldanalysis.risks[1]probabilisticNo verification or execution details provided for the withdrawal process
Причины:interpretive_fieldanalysis.risks[2]probabilisticFunds transferred to Foundation (centralized entity) rather than DAO treasury directly
Причины:interpretive_fieldanalysis.benefits[0]probabilisticRecovers idle funds from a decommissioned network (EOL announced June 2024)
Причины:contains_hard_literalinterpretive_fieldanalysis.benefits[1]probabilisticPrevents permanent loss of funds on deprecated PGN infrastructure
Причины:interpretive_fieldanalysis.unknowns[0]unverifiableExact amount of fees to be withdrawn
Причины:not_anchored_to_source_materialanalysis.unknowns[1]unverifiableSpecific destination address for the recovered funds
Причины:not_anchored_to_source_materialanalysis.unknowns[2]unverifiableExecution method and timeline for the withdrawal
Причины:not_anchored_to_source_materialanalysis.unknowns[3]unverifiableWhether any claims process exists for users or contracts still on PGN
Причины:not_anchored_to_source_materialrecommendation.reasoningprobabilisticThe proposal intent is sound (recovering stranded funds from an EOL network), but critical treasury parameters are missing: no amount specified, no destination address, and no execution details.
Причины:interpretive_fieldrecommendation.reasoningprobabilisticFor a user with high treasury_risk_sensitivity and needs_strict_spec=true, this underspecification presents material concern.
Причины:interpretive_fieldrecommendation.reasoningprobabilisticThe referenced EOL announcement and delayed timeline (originally Q4 2025, now Q2 2026) suggest legitimate operational necessity, but the lack of transparency on execution warrants caution.
Причины:contains_hard_literalinterpretive_fieldrecommendation.conflicts_with_user_principles[0]probabilisticneeds_strict_spec: Treasury proposal lacks specific amount and destination address
Причины:interpretive_fieldrecommendation.conflicts_with_user_principles[1]probabilistictreasury_risk_sensitivity: No execution verification details provided
Причины:interpretive_field
Смешанные сегменты
analysis.summary: unverifiable deterministic
Метод
Kind: heuristic
Version: 1
- Deterministic segments are anchored to extracted title/body/options, evidence quotes, or hard literals.
- Probabilistic segments include recommendation, risk, benefit, and uncertainty language.
- Unverifiable segments are vague or unsupported without clear anchors.
Обработка отказов
Отказ обнаружен: Yes
Сигналы
unknowns_present:4
Перенаправлено в: HUMAN_REVIEW
Refusal detection is heuristic and conservative. It routes ambiguous or underspecified cases to human review.
Использованный промпт
Structured governance analysis prompt. Must output ONLY valid JSON. Must not guess missing options/results; use UNKNOWN.
You are given:
URL:
https://snapshot.org/#/s:gitcoindao.eth/proposal/0xac01be13caef126ab758c160f91a7a0c616f94d15a3890872d485966d3869e56
EXTRACTED_DATA (may be incomplete):
{
"source_type": "snapshot",
"fetched_at": "2026-04-20T21:37:56.625Z",
"title": "[PROPOSAL] Withdrawing remaining fees from PGN back to the Gitcoin Foundation Q2 2026 (Original Q4 2025)",
"body": "Proposal to clawback idle funds sitting on PGN network as of April 16, 2026. Proposal first outlined August 2025. [EOL o...Модель: zai-org/GLM-5-FP8